Two bathrooms of the same size can cost very different amounts to rough in. The price follows the work hidden in the floor and walls, not the square footage. These are the things that move it.

The main cost drivers
- Number of fixtures. Each one needs a drain, a vent and water lines. A shower with several outlets counts for more than one.
- Distance to the stack. A new bathroom beside an existing one is far less work than one at the other end of the house.
- Concrete. Cutting and trenching a basement slab, and pouring it back, is a large part of a basement bathroom. See basement bathroom rough-in.
- Access. Open framing is the least work. Working above a finished ceiling, or in a crawlspace, adds time.
- Pumps. Where the drain is higher than the fixtures, a sewage ejector system adds equipment and electrical work.
- Fixture type. Wall-hung toilets, thermostatic valves, floor-mounted tub fillers and curbless showers need more in-wall and in-floor work.
- Old pipe at the tie-in. If the existing drain or supply is failing, it has to be replaced back to sound pipe.
- Permit and inspection. Permit fees vary by municipality, and inspections add visits.
New build, renovation or basement
New construction is the most efficient: open framing, no demolition, everything planned. Renovations add removal of old pipe and working around what stays. Basements add concrete and sometimes a pump. That is why a per-fixture price quoted for one kind of job rarely transfers to another.
What a rough-in quote should list
- Each fixture and what is being roughed in for it
- Pipe materials for drains and water lines
- Concrete cutting and patching, and who does it
- Permit, tests and inspection visits
- Whether the finish stage (setting fixtures and trims) is included or priced separately
- What is excluded: fixtures, tile, drywall, electrical for pumps
Where money is saved without cutting corners
- Keep new fixtures close to existing drains and stack bathrooms above one another
- Choose fixtures before rough-in, so nothing is moved twice
- Do related work in the same opening: old supply lines, shut-offs, future stubs. See roughing in for the future.
We do not publish a price list for rough-in, because the figure depends on the things above. We look at the job and give a written quote.
Why people call Seastack for this
- We look at the whole system before recommending anything, so the plan fits the house and not the other way around
- We explain the plan in plain words, with photos, and give a written quote before any work
- Our quotes list each fixture, the materials and what is excluded, so you can compare like with like
- A written workmanship warranty on the work we do (see our warranty and aftercare)
Questions people ask
They may cover different scopes. Check whether concrete, permits, the finish stage and replacing old pipe at the tie-in are included.
Usually, because drains are under concrete and a pump may be needed.
Generally yes. The toilet has the largest drain and the strictest slope and venting needs.
It should be stated either way. Ask if it is not listed.
Yes. We need the model numbers before rough-in so the pipes suit them.
Booking it
We quote and install plumbing rough-in across Langley, Surrey, Burnaby, Coquitlam, Maple Ridge, Abbotsford, Vancouver, the North Shore and the Tri-Cities. Send us your drawings or a few photos and a short description, and we will come back with next steps and a written quote before any work starts.
More guides
- Plumbing rough-in
- Bathroom rough-in
- Basement bathroom rough-in
- Moving a toilet, shower or drain
- Rough-in inspection and permits in BC
- Rough-in heights and dimensions
- Roughing in for the future
- Bathroom renovation plumbing: permits and order of work
Related guides
- Plumbing Rough-In Inspection and Permits in BC: What to Expect
- Moving a Toilet, Shower or Drain: What Is Possible and What It Involves
- Plumbing Vents Explained: Why Every Drain Needs Air
- Shower Valve and Tub Rough-In: What to Get Right Before Tile
Popular installs right now
Picked for this job in the Lower Mainland. Buy here and we install it.
GEBERIT Sigma01 Dual Flush Actuator Plate – Polished Chrome$203.81+ Install by Seastack · 20% off install labour when bought here
Kohler Veil Elongated Comfort Height Bowl (Less Seat) – White$681.19+ Install by Seastack · 20% off install labour when bought here
Kohler Memoirs Stately 2-Piece Round Front 1.28 GPF Comfort Height Toilet (Less Seat) – White$830.25+ Install by Seastack · 20% off install labour when bought here
Duval Cubist Comfort Height 16.5" Skirted Toilet Bowl – White$250.96+ Install by Seastack · 20% off install labour when bought here