The plumbing is the part of a bathroom renovation you will never see again, and the part that decides whether the finished room works. Here is what to expect on the plumbing side, and how to keep it from becoming the expensive part.

Do You Need A Permit?

Replacing fixtures in the same place is usually maintenance. Moving a toilet, adding a shower, relocating a vanity or changing drain and vent piping needs a plumbing permit in Langley, Surrey, Abbotsford and most Lower Mainland municipalities. Rough-in is inspected before walls close, then a final once fixtures are in. Skipping it shows up at resale or on an insurance claim, when it is far more expensive to deal with.

What Drives The Cost

The Order That Saves Money

  1. Choose fixtures before rough-in, so drains and supplies land where the actual vanity and tub go.
  2. Demolition and inspection of what is there.
  3. Rough-in: drains, vents, supplies, valve bodies, blocking. Permit inspection.
  4. Walls, tile and finishes.
  5. Fixture installation and final inspection.

The most common expensive mistake is a vanity or tub chosen after the walls are closed, with connections that do not match what is behind them.

Things Worth Adding While The Wall Is Open

Related: mechanical renovations · bathroom rough-in milestones · a Langley bathtub replacement

Related guides

All plumbing guides

Renovating or selling
See the plumbing upgrades buyers pay for.
Home value upgrades →
Licensed & Insured · Langley, BC778-389-3789Blueprint Drop-Off →
Follow us