The Project Overview:
A bathtub replacement in a Langley home. With the wall opened up, the new tub was set in place and the supply lines and valve were roughed in before the wall was closed up and finished. The photos on this page were taken during the job, between 28 January and 2 February 2026.
What We Did:
- New bathtub set in place with the wall opened
- Supply lines and tub valve roughed in
- Tub finished and ready to use
- Location: Langley, BC
- Service: Bathroom plumbing






